Tag Archives: PLC

Please Enjoy These Pages From Our September Calendar

Posted in Culley, Delta Automation, Delta service advantages, modicon, PLC | Tagged , , , , , , , , , , | Leave a comment

Please Enjoy Our February Calendar Pages

Posted in Delta Automation, Delta company news, Uncategorized | Tagged , , , , , , , , | Leave a comment

Temporary Remote I/O Cable Replacement Causes an Unexpected Issue

During a recent Modicon remote I/O service call at a large oil refineries tank farm which had been having intermittent communication, an unusual problem was discovered. The system had been having communication drop-outs intermittently for several weeks. During that time, … Continue reading

Posted in Delta Automation, Delta company news, Delta service advantages, modicon, On-site stories, PLC, Remote I/O, Service stories | Tagged , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Modbus Plus Super Tap: Features and a ‘Gotcha’

The Modbus Plus Super Tap is a vast improvement over the previous several designs that have been in service since the mid-eighties. The first connector to be used was the MBKT type. It had split type compression connections and used … Continue reading

Posted in Delta service advantages, Modbus Plus, modicon, On-site stories, Service stories, Tech Tips, Uncategorized | Tagged , , , , , , , , , , , , , , | 6 Comments

Quantum Remote I/O Metallic Cable System

This is the TDR trace that shows the original cable system on a recent project that Delta Automation, Inc. was tasked with repairing. This system shows many issues: excessive dB losses, poor splices, poor connections and terminations. This is the … Continue reading

Posted in Delta Automation, Delta service advantages, Modbus Plus, modicon, On-site stories, Remote I/O, Service stories | Tagged , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Enjoy the April page of our 2011 Calendar

Posted in Delta Automation, Delta company news | Tagged , , , , , | Leave a comment

Haiti Bound

The client inquired if Delta could get the unit completed and onto the ship by the next morning. Bob happily informed the client that the unit had been completed over the weekend and could be delivered that very day.
The client was ecstatic!
The reloaded and tested unit was delivered to the port authority and moved onto the ship with plenty of time to spare.
Early the next day the ship headed off to Haiti with it’s holds full of relief supplies. Continue reading

Posted in Service stories | Tagged , , , , , , , | Leave a comment